Size an AI review queue in reviewer minutes per shift. Multiply peak eligible arrivals by measured handling time for each case type, add work already waiting, and compare the total with the uninterrupted review time your scheduled staff actually have. Then check the order in which cases arrive. A shift can have enough total reviewer hours and still miss the deadline on cases that pile up before lunch.
Measure work and waiting separately
Start with the cases the workflow routes to people. Record the enqueue time, case type, deadline, and review disposition. Time the effort it takes to open the record, inspect the evidence, make a decision, and finish the required documentation. Track a second approval or a reopening as additional reviewer effort. Record waiting for an upstream document separately from active handling time, and keep that waiting visible in the original case's elapsed time. Track time and capacity by role when only a subset of reviewers can resolve a case type.
Build the demand estimate from a representative busy shift and compare it with other busy shifts. Pay attention to the mix. A surge of quick formatting checks can need fewer minutes than a smaller surge of vendor mismatches. For capacity, measure how much scheduled time qualified reviewers can devote to the queue after meetings, breaks, and other assignments. Use the observed active time and staffed availability with the same definitions so interruptions are counted once.
Work a four-hour peak shift
In this illustrative shift, reviewers can handle both case types. They each have 180 productive review minutes of a four-hour block, based on the planning assumption that they can work the queue for 75% of the scheduled time. The inherited cases below are eligible at shift start and are distinct from new arrivals.
| Work available during shift | Cases | Reviewer minutes per case | Reviewer minutes needed |
|---|---|---|---|
| New formatting exceptions | 80 | 4 | 320 |
| New vendor mismatches | 12 | 15 | 180 |
| Inherited formatting exceptions | 10 | 4 | 40 |
| Total | 102 | 540 |
The shift needs 540 active reviewer minutes, or 9 active hours. Two reviewers supply 360 minutes and leave 180 minutes of estimated work. Three supply 540 minutes, enough for the point estimate with zero allowance for overruns. A fourth can add 180 minutes if a qualified reviewer is available in the time block that needs help. Repeat the calculation by hour or replay past arrival timestamps. Even the larger shift total cannot clear cases before a deadline that falls before the extra reviewer starts.
Use the oldest eligible case to trigger action
Set a warning age for each deadline class that leaves time to finish the case. For example, in a class with a 90-minute service target, you might choose a 60-minute warning if the remaining 30 minutes covers handoff and handling in your observed operation. When the oldest eligible case crosses its warning age, tell the shift lead which cases have the least time left and which qualified capacity is free. Move eligible capacity to the threatened queue or pause lower-priority intake upstream where the workflow allows it. Keep the normal acceptance rules for work already in the queue. Track blocked cases with their own reason and owner, and keep their original deadline visible.
In the illustrative shift, a case that entered at 09:00 hits the 60-minute warning at 10:00 and is due at 10:30. If no qualified reviewer can start in time, escalate to the shift lead at 10:00 with the remaining work and deadline. Use an approved backup if one can finish on time. If the deadline is at risk after escalation, record that status and defer lower-priority intake where authorized. Keep the original case in its required review path.
AWS's discussion of asynchronous queues uses message age to surface lag that producer-side measurements can miss. The same measurement gives a review lead time to react even when the total queue looks small. Human review also needs role and deadline information so an action can change the affected cases' outcomes. AWS Builders' Library on queue backlogs
Take your busiest recorded shift and replay the case arrival times against the available qualified reviewers. Record which deadlines would have been missed and whether a staffing change or lower admission limit would have helped in time. Track the reviewer minutes in your broader workflow cost as well. sinc-LLM guide to measuring tokens, rework, and human review